/_media/adv/web/images/2011/20111124_Arthrex_TB-378x82.jpg

Subscriptions

Advertising

Resources

About Us

Contact Us

Create An Account Forgot Your Password?
Trouble logging in or creating an account? click here
Home This Month E-Weekly Newsletter Building a Facility Article Archive Second Opinions
Search:
Benchmarking
General Surgery
Accrediting/Quality
Anesthesia
Code/Bill/Reimburse
Building/Renovating
/_media/adv/web/images/2012/20120201_Provation_LB-154x100.gif
/_media/adv/web/images/2011/20111202_Arthrex_LB-154x100.jpg
/_media/adv/web/images/2011/20111226_Soma_LB-154x100.gif
/_media/adv/web/images/2012/20120126_APIC_LB-154x100.jpg
Outpatient Surgery E-Weekly

Contact Congress Over Drug Shortage Issues

A Kentucky congressman is urging surgical facilities to contact their members of Congress and request that they sign his letter demanding changes to...

N.J. Posts ASC Inspection Reports Online

State and federal inspection reports of New Jersey's ASCs are now available online, giving patients an opportunity to make more informed choices abo...

Are Opioids Necessary?

While it's not always practical, or even possible, to eliminate opioids from your post-op pain management regiment, reducing their use in favor of n...

Archive > February, 2008 Vol. IX, No. 2

10 Things the OR Should Know About Central Sterile

How two pressure-cooker departments can work together more effectively.

Nancy Chobin; and Terri Matthews

Besides the fact that we deal with widgets and you deal with people, here's a list of the things that most OR personnel don't fully appreciate about sterile processing. We hope this helps you understand why your instrument sets aren't always ready when you want them to be.

Sign in to continue reading.
Email Address:
Password:
Categories: Business Management, Infection Control, Staffing/Training, Peak Efficiency
Keywords:
1 What we do is highly regulated.; 2 We must follow instructions.; 3 We must wait for items to fully cool.; 4 Processing personnel require lots of training.; 5 Rigid containers have their own special requirements.; 6 We need decontamination "preference cards."; 7 Sterilization is getting more complex.; 8 We must measure staff competence.; 9 Quality improvement counts, too.; 10 Our workers are getting older.; One final thought; ASCs; Advancement; Association; Board; Certification Board; Depending; Distribution; Drying; Extensive; Included; Instrumentation; Medical Instrumentation; OR's; OR. So;... show all keywords
1 What we do is highly regulated.; 2 We must follow instructions.; 3 We must wait for items to fully cool.; 4 Processing personnel require lots of training.; 5 Rigid containers have their own special requirements.; 6 We need decontamination "preference cards."; 7 Sterilization is getting more complex.; 8 We must measure staff competence.; 9 Quality improvement counts, too.; 10 Our workers are getting older.; One final thought; ASCs; Advancement; Association; Board; Certification Board; Depending; Distribution; Drying; Extensive; Included; Instrumentation; Medical Instrumentation; OR's; OR. So; Packs; Photos; Processing; Quality; Remember: We're; Rigid; Sterile Processing; Sterilization; Ten; ability; achieve; acid; addition; additional; adequately; advent; advocates; affects; air; ambulatory; annual; annually; area; assisting; attract; backs; blood; book; brought; burns; buy; call; cards; center; central; certification; certified; challenge; changed; charts; checking; checks; chemical; clean; cleaned; cleaning; compatibility; competencies; competency; completely; complying; concentrated; configuration; container; containers; contents; corners; correct; cost; cycle; cycles; damage; deal; decontamination; demanding; detergent; device; diameter; difficult; direct; directly; disassemble; displacement; dry; dynamic; effective; employee; end; endoscope; ensure; equipment; ethylene; exceed; excellent; exposes; exposure; extended; extensive; facility's; fact; factor; filters; final; find; flexible; follow; fully; function; gas; goal; gravity; guidance; hand; handle; height; helps; high; high-level; highly; hope; hot; hours; immersed; impact; important; improvement; includes; including; indicator; indicator/integrator; infectious; information; inside; instructions; instrument; integrator; internal; items; job; large; list; longer; lots; low-paying; low-temperature; lower; lumen; make; managers; manual; manufacturer; manufacturers; material; maximum; means; measure; methods; mind; minutes; motivated; multi; nature; needed; neutral; newer; number; offers; online; open; opposite; orthopedic; oxide; ozone; pH; pack; packaging; parameters; part; peracetic; perform; personnel; phone; place; pores; pre-purchase; pre-vacuum; preference; pressures; prevent; procedure; process; processed; processing; products; profession; programs; proper; proportional; provide; providing; quality; quickly; racks; rankled; ready; reasonable; recommend; recommends; reference; regulatory; remain; remember; remove; reprocess; reprocessing; reprocessor; require; requirement; responsibility; restrictions; reusable; rigid; run; safe; safety; schedule; school; scopes; seek; serve; service; set; sets; size; sonic; sonication; sophistication; special; specific; squawks; stacked; staff; stand; steam; sterile; sterilization; sterilize; sterilizers; surgeon; surgery; surgical; systems; tabletop; technologies; temperature; test; testing; things; time; top; total; touted; training; transport; trapped; tray; turn; undergo; understaffed; understand; unusual; vehicle; verify; vulnerable; wait; wall; washed; water's; weight; widgets; wiped; work; workers; wrapped; wrapping; written; years

© Copyright Herrin Publishing Partners LP 2011. REPRODUCTION OF THIS COPYRIGHTED CONTENT IS STRICTLY PROHIBITED. We encourage LINKING to this content; view our linking policy here.

PRODUCT & SERVICE RESOURCES
Did You See This?
A showcase of products and services geared to make your facility better.

Architects' Showcase
Is a beautiful, efficient new facility in your future?
/_media/adv/web/images/2011/20111216_USWorldMeds_AR-300x250.jpg
Other Articles That May Interest You
Court Rules Against OR Nurse in $1.6M Disability Discrimination Claim
Nurse sued hospital that fired her after back injury left her incapable of lifting more than 40 lbs.
Anesthesiologist Pays $8.2M for Praising Error-Prone Colleague
Doctor's letter of recommendation implicated him in colleague's malpractice suit.
Are You Ready for an MH Emergency?
Speed your staff's response with this effective memory aid.